Powder Grinding Station
Power grinding station is an indispensable device in powder production line, which is used to grind limestone, slag, steel slag, fly ash and so on into fine powder. It is widely used in high-quality cement mixing, large volume concrete and commercial concrete mixing station, high performance concrete, marine engineering, wharf, reservoir, tunnel engineering and so on.
-
Raw Material Storage and Transportation System
The raw material storage and transportation system of the powder grinding station consists of material shed, material receiving hopper, quantitative feeder, conveying equipment, etc. The raw materials (limestone, slag, steel slag, etc.) are pushed into the receiving hopper by the loader for feeding operation. The material shed is portal steel frame workshop so as to meet the needs of feeding, loading and other operations. The raw material storage and transportation system of the grinding station is designed according to the project scale and the situation of the customer’s site, with compact layout, strong adaptability, short construction period, and low investment cost, realizing customer’s benefits to the maximum extent. -
Batching System
The role of batching system is to mix the calcareous raw materials, clay raw materials and correction raw materials produced by cement according to a certain component, and sent the mixed materials to the mill through the conveying equipment. The batching system mainly includes the silo roof belt conveyor, batching silo, quantitative feeder, conveying equipment, etc. Batching system is the key to ensure the quality of cement. Manxing batching system has a high degree of automation and accurate batching measurement, which is a reliable guarantee for cement production. -
Finished Product Storage and Transportation System
For pulverized limestone powder, slag powder, steel slag powder, cement, etc., a finished product silo usually keeps 7-14 days of reserves. The finished product storage and transportation system consists of bucket elevator, dust collector, finished product silo, silo bottom fluidization system, bulk loading equipment, packaging equipment, etc. Manxing can provide welded steel silos, spiral steel silos, bolted steel silos and other different types of silos for customers. The layout of finished product storage and transportation system is flexible, so it can meet the needs of customers, and the investment and operation cost are low.
Typical process layout
-
Finished Product Storage and Transportation System -
Raw Material Storage and Transportation System
SILO TYPE SELECTION
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +

Engineering Experience and Clients
-
40+Countries
-
100+Technical patents
-
3000000TMaterial storage capacity
-
900+Silo projects
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
Large Welded Steel Silo -
Spiral Steel Silo -
Large Bolted Steel Silo -
Small Bolted Steel Silo -
Tgd-Type Wire Belt Bucket Elevator -
Dust Collector -
Wharf Transit System - Spiral Ship Unloader Unloading System -
Packing Machine -
South Korea Slag Cement Mixing System for POSCOThis is a POSCO Group slag cement mixing project contracted by Manxing. This project is an overseas EPC general contracting project. The design, supply and construction of the project are all completed by our company.Slag powder, cementSlag (1000 tons)/cement (3000 tons)Spiral silo, Bolted silo -
Indonesia 2x3,000T Cement Steel Silo Project for SIGThis is a cement transfer project, of which the owner is SIG, the largest cement producer in Indonesia.Cement2x3000 tonsSpiral silo -
Indonesia 6,000T Cement Steel Silo Project for SIGThis is a cement transfer project, of which the owner is SIG, the largest cement producer in Indonesia.Cement6000 tonsSpiral silo