Contact
Bulk Material Handling Solution
Material: All Bulk Materials
System Design
How It Works
The bulk material handling solution provides complete material flow from receipt to process: (1) Truck/rail/ship unloading station, (2) Mechanical or pneumatic conveying to storage, (3) Storage silos with discharge systems, (4) In-plant distribution to process points, (5) Weighing and batching integration, (6) Dust collection throughout, (7) Centralized control system with remote monitoring.
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000