Contact
Gypsum Storage Solution
Material: Gypsum (Natural, FGD, Phosphogypsum)
System Design
How It Works
The gypsum storage solution includes: (1) Conveying system to silo, (2) Corrosion-resistant silo (stainless 316L or epoxy-coated), (3) Live bottom discharge with sweep auger, (4) Dehumidification system, (5) Dust collection, (6) Moisture monitoring and control.
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000