Contact
Sand Storage Solution
Material: Sand (Construction, Frac, Foundry, Silica)
System Design
How It Works
The sand storage solution includes: (1) Mechanical conveying (belt/bucket elevator), (2) Mass flow silo with wear lining, (3) Gravity or mechanical discharge, (4) Batching/weighing integration, (5) Dust suppression at transfer points, (6) Optional heating for frozen sand prevention.
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000