Contact
Slag Storage Solution
Material: GGBFS / Steel Slag
System Design
How It Works
The slag storage solution includes: (1) Pneumatic or mechanical conveying to silo, (2) Ceramic-lined silo with dehumidified aeration, (3) Wear-resistant discharge system, (4) Dehumidification unit for aeration air, (5) Dust collection system, (6) Moisture and temperature monitoring.
Start Your Project Today
Our engineers will design the optimal solution for your needs
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000