Угольная промышленность
Решения для хранения и транспортировки сыпучих материалов
Угольная промышленность
В процессе угледобычи традиционное открытое хранение угля и погрузка с помощью ручных погрузчиков постепенно вытесняются из-за серьёзного загрязнения окружающей среды и низкой эффективности. Manxing предоставляет клиентам решения, включая крупные угольные силосы, системы быстрой погрузки, системы быстрой дозированной погрузки, ленточные конвейеры большой протяжённости и другие.
Coal Storage
Coal Storage
Generally, enclosed coal storage warehouse and coal storage silo are used to store coal. The enclosed coal storage warehouse is completely closed with a spherical reticulated shell at its top. Manxing coal storage warehouse is equipped with spray dust suppression system, which is safe and pollution-free; and it has stable steel grid structure, low cost, and large coal storage capacity. The diameter of a coal storage warehouse can reach 120m, and the reserves of coal storage warehouses are in the range of 2-200,000 tons. Coal storage silo is applicable to the occasions of limited site and small reserves. Manxing coal storage silo is steel silo, with single silo storage capacity in the range of 0.5-30,000 tons, which has advantages of small footprint, low investment cost and short construction period.
Rapid Loading System
Rapid Loading System
Rapid loading system is used for quick loading of trucks. The rapid loading system is composed of belt conveyor, buffer silo, rapid loading chute, control gate, hydraulic system, dust collection system, water mist dust suppression system, silo monitoring system and electrical control system. According to customers’ needs, Manxing rapid loading system can be configured with single-lane, two-lane, four-lane loading station systems with instantaneous loading capacity of 1t/s. The water mist dust suppression in the loading process, achieves efficient and environmental loading operation, bringing economic benefits to customers.
Rapid and Quantitative Loading System
Rapid and Quantitative Loading System
Rapid and quantitative loading system is used for rapid and quantitative loading of trains. It is the most advanced coal, ore and bulk materials railway loading method which can realize continuous, dynamic, rapid, quantitative and accurate loading of trains by batching in quantitative silo in advance according to standard weight, and then unloading them quickly to the moving train. Manxing rapid and quantitative loading system can complete loading operation in the process of train moving, loading speed is less than 45 seconds per carriage, measurement accuracy is high, single loading accuracy can reach 0.1%, and the whole train loading accuracy can reach ±0.05%.
Имя:
*Email:
Тел/Whatsapp:
*Сообщение:
Типовая технологическая схема
Fast Loading System
Fast Loading System
Coal Mine Storage
Coal Mine Storage
ПОДБОР ТИПА СИЛОСА
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
ПОЧЕМУ MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
Другие связанные сертификаты +
Сертификаты
Инженерный опыт и клиенты
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
EPC УСЛУГИ
Инженерные консультации
Инженерные консультации
Проектирование
Проектирование
Производство оборудования
Производство оборудования
Строительно-монтажные работы
Строительно-монтажные работы
Монтаж и пусконаладка
Монтаж и пусконаладка
Эксплуатационное управление
Эксплуатационное управление
Пожалуйста, заполните форму ниже, чтобы отправить запрос.
Мы ответим вам в течение 24 часов.
Имя:
*Email:
Тел/Whatsapp:
*Сообщение:
Тел: +86 159 3903 7000
[email protected]
+86 159 3903 7000