Терминал для сыпучих материалов
Решения для хранения и транспортировки сыпучих материалов
Терминал для сыпучих материалов
Развитие глобальной торговой интеграции способствовало росту мирового спроса на перевозку сыпучих грузов. Объём морских перевозок насыпных грузов стремительно увеличивается. С развитием морских перевозок погрузка, разгрузка и перевалка сыпучих материалов в терминале играют огромную роль в сфере терминалов для сыпучих материалов и приносят выгоду заказчикам.
Ship Unloading System
Ship Unloading System
Terminal ship unloading system mainly consists of ship unloader, conveying equipment, intermediate storage silo and dust removal system. Manxing provides terminal planning, bulk material unloading and transfer and other complete solutions for customers. According to customers’ requirements, it can be equipped with grab-type ship unloader + dust-free hopper ship unloading system, screw-type ship unloader + air chute ship unloading system, etc. Manxing terminal unloading system is designed and planned according to specific projects, applicable to various bulk materials, different ship types and the requirements of unloading capacity of 150-2000t/h.
Ship Loading System
Ship Loading System
The loading system mainly consists of silos, conveying equipment, ship loaders and auxiliary systems. Welded steel silos and spiral silos can be used. According to different needs of customers, the equipment used in the loading system includes air chute, belt conveyor, mobile ship loader, fixed ship loader, dust collector, electrical control system, etc. Conveying equipment is mainly composed of air chute and belt conveyor. Based on customers’ demands, Manxing can provide shipping systems with capacity of 150-600t/h.
Terminal Loading and Distribution System
Terminal Loading and Distribution System
Terminal loading and distribution system is used for loading bulk materials unloaded from ship on truck directly. It mainly includes ship unloader, air chute, bulk loader and dust collection system. The cement is transported to the air chute by the ship unloader, and then loaded directly into the cement tank truck by the bulk loader. The system is simple and efficient. By controlling the chute discharge valve, you can switch feeding and loading operation of two bulk loaders to realize continuous ship unloading and loading. Manxing terminal loading and distribution system is designed according to customers’ needs, with characteristics of simple process, flexible layout, and low investment cost.
Имя:
*Email:
Тел/Whatsapp:
*Сообщение:
Типовая технологическая схема
Wharf Loading Distribution System
Wharf Loading Distribution System
Ship Unloading System
Ship Unloading System
ПОДБОР ТИПА СИЛОСА
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
ПОЧЕМУ MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
Другие связанные сертификаты +
Сертификаты
Инженерный опыт и клиенты
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
Заказчик
EPC УСЛУГИ
Инженерные консультации
Инженерные консультации
Проектирование
Проектирование
Производство оборудования
Производство оборудования
Строительно-монтажные работы
Строительно-монтажные работы
Монтаж и пусконаладка
Монтаж и пусконаладка
Эксплуатационное управление
Эксплуатационное управление
Пожалуйста, заполните форму ниже, чтобы отправить запрос.
Мы ответим вам в течение 24 часов.
Имя:
*Email:
Тел/Whatsapp:
*Сообщение:
Тел: +86 159 3903 7000
[email protected]
+86 159 3903 7000