Terminal de Materiales a Granel
Soluciones de almacenamiento y transporte de materiales a granel
Terminal de Materiales a Granel
El desarrollo de la integración del comercio global ha promovido la demanda mundial de transporte de materiales a granel. El volumen de transporte marítimo de carga a granel aumenta rápidamente. Con el desarrollo del transporte marítimo, la carga, descarga y transferencia de materiales a granel en la terminal desempeñan un papel fundamental en el sector de terminales de materiales a granel, generando beneficios para los clientes.
Ship Unloading System
Ship Unloading System
Terminal ship unloading system mainly consists of ship unloader, conveying equipment, intermediate storage silo and dust removal system. Manxing provides terminal planning, bulk material unloading and transfer and other complete solutions for customers. According to customers’ requirements, it can be equipped with grab-type ship unloader + dust-free hopper ship unloading system, screw-type ship unloader + air chute ship unloading system, etc. Manxing terminal unloading system is designed and planned according to specific projects, applicable to various bulk materials, different ship types and the requirements of unloading capacity of 150-2000t/h.
Ship Loading System
Ship Loading System
The loading system mainly consists of silos, conveying equipment, ship loaders and auxiliary systems. Welded steel silos and spiral silos can be used. According to different needs of customers, the equipment used in the loading system includes air chute, belt conveyor, mobile ship loader, fixed ship loader, dust collector, electrical control system, etc. Conveying equipment is mainly composed of air chute and belt conveyor. Based on customers’ demands, Manxing can provide shipping systems with capacity of 150-600t/h.
Terminal Loading and Distribution System
Terminal Loading and Distribution System
Terminal loading and distribution system is used for loading bulk materials unloaded from ship on truck directly. It mainly includes ship unloader, air chute, bulk loader and dust collection system. The cement is transported to the air chute by the ship unloader, and then loaded directly into the cement tank truck by the bulk loader. The system is simple and efficient. By controlling the chute discharge valve, you can switch feeding and loading operation of two bulk loaders to realize continuous ship unloading and loading. Manxing terminal loading and distribution system is designed according to customers’ needs, with characteristics of simple process, flexible layout, and low investment cost.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Distribución típica del proceso
Wharf Loading Distribution System
Wharf Loading Distribution System
Ship Unloading System
Ship Unloading System
SELECCIÓN DE TIPO DE SILO
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
POR QUÉ MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
Más certificados relacionados +
Certificaciones
Experiencia en ingeniería y clientes
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
SERVICIO EPC
Consultoría de Ingeniería
Consultoría de Ingeniería
Diseño de Ingeniería
Diseño de Ingeniería
Fabricación de Equipos
Fabricación de Equipos
Construcción del Proyecto
Construcción del Proyecto
Instalación y Puesta en Marcha
Instalación y Puesta en Marcha
Gestión Operativa
Gestión Operativa
Por favor, no dude en enviar su consulta a través del siguiente formulario.
Le responderemos en 24 horas.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000