Patio de Materiales a Granel
Soluciones de almacenamiento y transporte de materiales a granel
Patio de Materiales a Granel
El patio de materiales a granel es la forma principal de almacenamiento de materiales a granel, que se puede dividir en patio de franjas, patio esférico y almacén de muro cilíndrico alto según las diferentes estructuras de almacenamiento.
Strip Stockyard
Strip Stockyard
Strip stockyard is widely used in building materials, metallurgy, steel and other industries, with dual functions of storage and homogenization. Strip stockyard adopts grid structure, and uses stacker and reclaimer to complete mechanized stacking and reclaiming. There are various ways of stacking and reclaiming, which can be designed according to the project scale, customer’s actual situation and site conditions. Steel frame structure or plane grid structure is adopted at the top of the strip stockyard. Manxing strip stockyard has the characteristics of low cost, short construction period, good homogenization effect and easy expansion.
Circular Stockyard
Circular Stockyard
The top of circular stockyard is spherical grid structure and its bottom is reinforced concrete retaining wall. The circular stockyard uses the central reclaimer to complete the stacking and reclaiming operations. The diameter of a circular stockyard is generally between 60~120m. The cantilever stacker at the top of the central column can rotate and pitch around the central column in a range of 360 degrees. Circular stockyard covers an area of circular shape, which is adaptable. The circular stockyard also has the advantages of small area, high site utilization rate, convenient stacking and reclaiming operations, low investment cost, and continuous simultaneous stacking and reclaiming operations.
Raw Material Silo
Raw Material Silo
For the occasions that raw material reserves are not large, and homogenization is not required, you can use a silo to store raw materials. Raw material silo can be steel silo or reinforced concrete silo. Manxing can provide steel silos of which single silo storage capacity is 1-50,000 tons and reinforced concrete silos of which single silo storage capacity is 1-80,000 tons and the diameter is between 20 and 60m. Manxing will design different types of silos and feeding and discharging systems according to project size, material properties and feeding and discharging methods. Manxing material silo is characterized by low investment cost, small footprint and good sealing.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Distribución típica del proceso
Strip Stockyard
Strip Stockyard
Circular Silo
Circular Silo
SELECCIÓN DE TIPO DE SILO
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
POR QUÉ MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
Más certificados relacionados +
Certificaciones
Experiencia en ingeniería y clientes
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
SERVICIO EPC
Consultoría de Ingeniería
Consultoría de Ingeniería
Diseño de Ingeniería
Diseño de Ingeniería
Fabricación de Equipos
Fabricación de Equipos
Construcción del Proyecto
Construcción del Proyecto
Instalación y Puesta en Marcha
Instalación y Puesta en Marcha
Gestión Operativa
Gestión Operativa
Por favor, no dude en enviar su consulta a través del siguiente formulario.
Le responderemos en 24 horas.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000