Industria de Energía Térmica
Soluciones de almacenamiento y transporte de materiales a granel
Industria de Energía Térmica
La ceniza volante se produce con la combustión de carbón pulverizado en la central térmica, lo cual contaminará el medio ambiente si no se trata adecuadamente. La recuperación y utilización de la ceniza volante puede evitar la contaminación ambiental y aumentar los beneficios económicos. Manxing ofrece a los clientes sistemas de almacenamiento, transporte y separación de ceniza volante, así como soluciones profesionales.
Fly Ash Storage System
Fly Ash Storage System
Manxing can provide various specifications of fly ash silo storage system with storage capacity of 1000-50000 m³. Fly ash storage and transportation system consists of large steel silo, pneumatic conveying feeding pipe, silo roof dust collector, material level instrument, pressure release valve, silo bottom fluidization discharging system, conveying equipment and small distribution silo. According to the specific situations of customers, Manxing provides customers with fly ash storage, transportation, and distribution system solutions with short construction period and low investment cost, to create profits for customers to the greatest extent.
Fly Ash Pneumatic Conveying System
Fly Ash Pneumatic Conveying System
Manxing provides customers with pulse pneumatic conveying system, positive pressure pneumatic conveying system, thin-phase pneumatic conveying system and other solutions. Manxing fly ash pneumatic conveying system has the characteristics of high automation, simple operation, fast conveying and high conveying efficiency. Manxing pneumatic conveying equipment includes silo type pump, material sealing pump, spiral pneumatic conveying pump, rotary feeder, pneumatic lifting pump, electrical control system, etc. Manxing pneumatic conveying system has long service life, almost no maintenance and flexible conveying.
Fly Ash Separation System
Fly Ash Separation System
The principle of fly ash separation system is to separate the fly ash produced by thermal power plants into coarse ash, grade I ash and grade II ash according to different particle sizes through a separator. Advantages of Manxing fly ash separation system: stable and reliable operation, high degree of automation, simple system operation, large processing capacity, high separation efficiency which is more than 85%, high wear-resisting performance, low investment cost and flexible system layout. Manxing can adopt discrete arrangement, centralized arrangement on the side of silo and centralized arrangement on the top of silo according to customers’ requirements.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Distribución típica del proceso
Fly Ash Storage System
Fly Ash Storage System
Fly Ash Pneumatic Conveying Project
Fly Ash Pneumatic Conveying Project
SELECCIÓN DE TIPO DE SILO
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
POR QUÉ MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
Más certificados relacionados +
Certificaciones
Experiencia en ingeniería y clientes
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
SERVICIO EPC
Consultoría de Ingeniería
Consultoría de Ingeniería
Diseño de Ingeniería
Diseño de Ingeniería
Fabricación de Equipos
Fabricación de Equipos
Construcción del Proyecto
Construcción del Proyecto
Instalación y Puesta en Marcha
Instalación y Puesta en Marcha
Gestión Operativa
Gestión Operativa
Por favor, no dude en enviar su consulta a través del siguiente formulario.
Le responderemos en 24 horas.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000