Industria de Arena y Agregados
Soluciones de almacenamiento y transporte de materiales a granel
Industria de Arena y Agregados
La selección de la línea de producción de arena y agregados es una parte importante de la producción moderna de agregados. La línea de producción consta de tres sistemas: tolva de recepción de mineral, trituración y clasificación, y almacenamiento de producto terminado. Manxing ofrece a los clientes soluciones profesionales para sistemas de estaciones de arena y agregados.
Ore Receiving Hopper
Ore Receiving Hopper
The ore is sent into the ore receiving hopper by a truck or a loader, and a vibrating feeder is provided at the bottom of the receiving hopper to send the raw material ore into the crusher for crushing. The ore receiving hopper adopts underground or semi-underground welding type hopper, which is usually designed to be square or rectangular, the ore receiving hopper volume meets the load weight of not less than 2 ore carrying trucks due to its high structure strength, and special wear-resistant lining plate is installed on the inner wall of the hopper, fully adapting to the bulk ore unloading impact, high hardness ore impact, abrasion and other harsh conditions.
Intermediate Buffer Silo
Intermediate Buffer Silo
In order to adjust the production imbalance caused by the different production capacity, or for the needs of subsequent crushing process, it is necessary to set a buffer silo in front of the crusher. The buffer silo can be cylindrical or square to satisfy the 10-15min production storage time. A special wear-resistant lining plate is installed in the cone of the buffer silo to bear the abrasion of unloading ore on the cone. A bar valve is installed at the bottom of silo for cutting off the material flow during equipment maintenance. The cone angle is designed according to the material characteristics, and the pneumatic arch breaking hammer, air cannon and other anti-blocking equipment are equipped in the cone.
Finished Product Silo and Distribution
Finished Product Silo and Distribution
The finished product silo is used for the storage and distribution of finished sandstone. The storage time of the sandstone finished product silo: usually the finished product silo capacity can meet 12h production reserves. Finished product silo is circular, and can be arranged in a row. According to customers' different needs and reserves, the finished product silo can be welded steel silo, bolted steel silo or spiral steel silo. It can also be equipped with bucket elevator, belt conveyor, dust collector, bulk loading machine and other equipment according to customers' needs, to provide customers with system solutions.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Distribución típica del proceso
Finished Silo and Distribution
Finished Silo and Distribution
Ore Receiving Hopper
Ore Receiving Hopper
SELECCIÓN DE TIPO DE SILO
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
POR QUÉ MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
Más certificados relacionados +
Certificaciones
Experiencia en ingeniería y clientes
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
SERVICIO EPC
Consultoría de Ingeniería
Consultoría de Ingeniería
Diseño de Ingeniería
Diseño de Ingeniería
Fabricación de Equipos
Fabricación de Equipos
Construcción del Proyecto
Construcción del Proyecto
Instalación y Puesta en Marcha
Instalación y Puesta en Marcha
Gestión Operativa
Gestión Operativa
Por favor, no dude en enviar su consulta a través del siguiente formulario.
Le responderemos en 24 horas.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000