Estación de Carga
Soluciones de almacenamiento y transporte de materiales a granel
Estación de Carga
En las industrias de minerales, carbón, cemento y otras, la transferencia y carga de materiales a granel se realiza en la mina, el muelle o la estación ferroviaria. La estación de carga puede realizar una carga rápida y cuantitativa.
Mine Loading Station
Mine Loading Station
Mine loading station is composed of feeding belt, buffer silo, rapid loading chute, gate, monitoring system, hydraulic system, water mist dust suppression system, dust removal system and electrical control system. According to different needs of customers, Manxing rapid loading system can be configured with single lane, two-lane and other loading station systems, which has high loading efficiency, with instantaneous loading capacity of 1t/s. The water mist dust suppression in the loading process, achieves efficient and environmental loading operation, bringing economic benefits to customers.
Wharf Loading Station
Wharf Loading Station
Wharf loading station is used for loading coal and ore unloaded from ships into trucks. After ship unloading, the materials are discharged into the dust-free hopper, and then transported to the loading station through a belt conveyor. The loading station is equipped with a bulk loader and the top of the station is equipped with a dust collector. According to different needs of customers, wharf loading station can be designed as single lane or multi-lane, and the loading capacity of single lane wharf loading station is 600t/h. Manxing wharf loading station has simple process, low height, and low construction and operation cost, also, it can be designed according to customers’ needs.
Train Loading Station
Train Loading Station
Rapid and quantitative loading system is used for rapid and quantitative loading of trains. It is the most advanced coal, ore and bulk materials railway loading method which can realize continuous, dynamic, rapid, quantitative and accurate loading of trains by batching in quantitative silo in advance according to standard weight, and then unloading them quickly to the moving train. Manxing rapid and quantitative loading system can complete loading operation in the process of train moving, loading speed is less than 45 seconds per carriage, measurement accuracy is high, single loading accuracy can reach 0.1%, and the whole train loading accuracy can reach ±0.05%.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Distribución típica del proceso
Train Loading Station
Train Loading Station
Mine Loading Station
Mine Loading Station
SELECCIÓN DE TIPO DE SILO
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
POR QUÉ MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
Más certificados relacionados +
Certificaciones
Experiencia en ingeniería y clientes
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
Cliente
SERVICIO EPC
Consultoría de Ingeniería
Consultoría de Ingeniería
Diseño de Ingeniería
Diseño de Ingeniería
Fabricación de Equipos
Fabricación de Equipos
Construcción del Proyecto
Construcción del Proyecto
Instalación y Puesta en Marcha
Instalación y Puesta en Marcha
Gestión Operativa
Gestión Operativa
Por favor, no dude en enviar su consulta a través del siguiente formulario.
Le responderemos en 24 horas.
Nombre:
*Correo electrónico:
Tel/WhatsApp:
*Mensaje:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000