Bulk Material Stockyard
Bulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
-
Strip Stockyard
Strip stockyard is widely used in building materials, metallurgy, steel and other industries, with dual functions of storage and homogenization. Strip stockyard adopts grid structure, and uses stacker and reclaimer to complete mechanized stacking and reclaiming. There are various ways of stacking and reclaiming, which can be designed according to the project scale, customer’s actual situation and site conditions. Steel frame structure or plane grid structure is adopted at the top of the strip stockyard. Manxing strip stockyard has the characteristics of low cost, short construction period, good homogenization effect and easy expansion. -
Circular Stockyard
The top of circular stockyard is spherical grid structure and its bottom is reinforced concrete retaining wall. The circular stockyard uses the central reclaimer to complete the stacking and reclaiming operations. The diameter of a circular stockyard is generally between 60~120m. The cantilever stacker at the top of the central column can rotate and pitch around the central column in a range of 360 degrees. Circular stockyard covers an area of circular shape, which is adaptable. The circular stockyard also has the advantages of small area, high site utilization rate, convenient stacking and reclaiming operations, low investment cost, and continuous simultaneous stacking and reclaiming operations. -
Raw Material Silo
For the occasions that raw material reserves are not large, and homogenization is not required, you can use a silo to store raw materials. Raw material silo can be steel silo or reinforced concrete silo. Manxing can provide steel silos of which single silo storage capacity is 1-50,000 tons and reinforced concrete silos of which single silo storage capacity is 1-80,000 tons and the diameter is between 20 and 60m. Manxing will design different types of silos and feeding and discharging systems according to project size, material properties and feeding and discharging methods. Manxing material silo is characterized by low investment cost, small footprint and good sealing.
Typical process layout
-
Strip Stockyard -
Circular Silo
SILO TYPE SELECTION
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +

Engineering Experience and Clients
-
40+Countries
-
100+Technical patents
-
3000000TMaterial storage capacity
-
900+Silo projects
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
Large Welded Steel Silo -
Spiral Steel Silo -
Large Bolted Steel Silo -
Small Bolted Steel Silo -
Belt Conveyor -
Unattended Intelligent Loading and Weighing System -
Rapid & Quantitative Truck Loading System -
Belt Scale -
6x10,000T Welded Clinker Silo System for San Miguel CorporationThis project is San Miguel Corporation, Davao, the Philippines 10x10000 tons steel silos system contracted by Manxing. Among which, there are six clinker steel silos.Clinker60,000 tonsLarge welded steel silo -
Hubei-JUHAI Environment Ceramsite and Phosphogypsum Storage Packaging ProjectThis project is the Phase II of the silo project of phosphogypsum solid waste industry of Hubei JUHAI Environment, which is the first ceramsite and phosphogypsum storage and packaging engineering project constructed by our company.Phosphogypsum6Small welded steel silo -
Pakistan Truck Loading Station ProjectManxing undertook the supply of 2x5000t loading station and supporting facilities. Manxing completed the overall engineering design of the project and the structure and construction design of the 2x5000 tons concrete silo and a local company completed construction. Other mechanical and electrical equipment were designed, supplied and installed by Manxing.Coal2x5000 tonsConcrete silo
Please feel free to give your inquiry in the form below.
We will reply you in 24 hours.








