Storage System
Complete bulk material storage and handling solutions
Storage System Introduction
A bulk storage system is more than a silo — it is the chain of receiving, storing, reclaiming, conveying and controlling that decides whether your plant runs at full capacity. With 900+ silo projects delivered in 40+ countries, Manxing's engineering team sizes every system to your material's flow behavior, moisture and abrasiveness, then pairs the right silo construction with discharge and dust-control equipment so the line stays flowing with minimal manual intervention.
Bulk Material Storage System
From welded and spiral steel silos to enclosed stockyards and wharf handling, Manxing acts as a single EPC partner — one contract covering process design, in-house fabrication, civil works, installation and commissioning, so interfaces and responsibility stay clear.
Material Handling
Our handling scope wraps the silo end-to-end: receive, discharge, convey, blend, de-dust, weigh, bag and load — engineered as one coordinated train rather than isolated machines, which is what keeps material loss and downtime low.
Intelligent Control System
A Manxing plant is observable. PLC control with SCADA data acquisition puts live levels, alarms and trends on one screen, letting your operators manage storage and conveying remotely and catch deviations before they stop production.
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000