Long-distance Conveying System
The length of a long-distance conveying machine can reach tens of kilometers, it is applicable to mining area, wharf, and transfer station for long-distance and continuous conveying
-
Tubular Belt ConveyorTubular belt conveyor is also a widely used conveying equipment in long-distance conveying system. It is mainly used to convey powdery, granular and other bulk materials ( density is less than 2500kg / m³ ) and is suitable for the situation which has closeness requirements for the conveying environment. -
Belt ConveyorBelt conveyor is a kind of machinery which drives continuous transportation of material by friction. According to the requirements of the conveying process and different terrain and working conditions, conveyor system is formed through design and calculation.
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in power plant boilers. It is a fine powder that is a byproduct of burning pulverized coal in electric generation power plants. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Bulk Material StockyardBulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
View More




