Dust Removal System
Dust removal system solutions are applicable to industrial process filtration and dust collection applications.
-
Dust CollectorDust collector is used to separate dust from bulk materials, which is divided into single-machine dust collector, air-box dust collector and small dust collector. -
Mist Spray Dust Suppression SystemThe high-pressure mist spray dust removal equipment uses a high-pressure plunger pump to atomize water with high pressure, so that the mist can quickly adhere to and condense the suspended dust in the air and fall to the ground, so as to achieve the purpose of spraying mist to remove dust and air purification.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More




