Bulk Material Terminal
The development of global trade integration has promoted the global demand for bulk material transportation. The sea transportation volume of bulk cargo is increasing rapidly. With the development of sea transportation, loading, unloading and transfer of bulk materials in the terminal play a huge role in the field of bulk material terminal, and bring benefits to customers.
-
Ship Unloading System
Terminal ship unloading system mainly consists of ship unloader, conveying equipment, intermediate storage silo and dust removal system. Manxing provides terminal planning, bulk material unloading and transfer and other complete solutions for customers. According to customers’ requirements, it can be equipped with grab-type ship unloader + dust-free hopper ship unloading system, screw-type ship unloader + air chute ship unloading system, etc. Manxing terminal unloading system is designed and planned according to specific projects, applicable to various bulk materials, different ship types and the requirements of unloading capacity of 150-2000t/h. -
Ship Loading System
The loading system mainly consists of silos, conveying equipment, ship loaders and auxiliary systems. Welded steel silos and spiral silos can be used. According to different needs of customers, the equipment used in the loading system includes air chute, belt conveyor, mobile ship loader, fixed ship loader, dust collector, electrical control system, etc. Conveying equipment is mainly composed of air chute and belt conveyor. Based on customers’ demands, Manxing can provide shipping systems with capacity of 150-600t/h. -
Terminal Loading and Distribution System
Terminal loading and distribution system is used for loading bulk materials unloaded from ship on truck directly. It mainly includes ship unloader, air chute, bulk loader and dust collection system. The cement is transported to the air chute by the ship unloader, and then loaded directly into the cement tank truck by the bulk loader. The system is simple and efficient. By controlling the chute discharge valve, you can switch feeding and loading operation of two bulk loaders to realize continuous ship unloading and loading. Manxing terminal loading and distribution system is designed according to customers’ needs, with characteristics of simple process, flexible layout, and low investment cost.
Typical process layout
-
Wharf Loading Distribution System -
Ship Unloading System
SILO TYPE SELECTION
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +

Engineering Experience and Clients
-
40+Countries
-
100+Technical patents
-
3000000TMaterial storage capacity
-
900+Silo projects
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
Large Welded Steel Silo -
Spiral Steel Silo -
Large Bolted Steel Silo -
Small Bolted Steel Silo -
Wharf Transit System - Spiral Ship Unloader Unloading System -
Dust Collector -
Belt Conveyor -
Truck Loader -
6x10,000T Welded Clinker Silo System for San Miguel CorporationThis project is San Miguel Corporation, Davao, the Philippines 10x10000 tons steel silos system contracted by Manxing. Among which, there are six clinker steel silos.Clinker60,000 tonsLarge welded steel silo -
Indonesia 6,000T Cement Steel Silo Project for SIGThis is a cement transfer project, of which the owner is SIG, the largest cement producer in Indonesia.Cement6000 tonsSpiral silo -
Baowu 3x5,000T Steel Slag Powder Steel Silos ProjectThe project is a domestic project undertaken by Manxing. It is 3 sets of spiral steel silos with a total storage capacity of 15,000t for the storage and disposal of steel slag powder at BAOWU Wuhan Metal Resources Limited CompanySteel Slag Powder15,000 tonsSpiral steel silo