Wharf Transit System - Spiral Ship Unloader Unloading System

Manxing provides customers with wharf bulk loading, unloading, conveying, loading and storage systems with a variety of specifications and models and uses, which are suitable for loading and unloading, transit, and transportation of cement, fly ash, mineral powder, coal, cement clinker and other bulk materials.
Wharf Transit System - Spiral Ship Unloader Unloading System
Wharf Transit System - Spiral Ship Unloader Unloading System
Wharf Transit System - Spiral Ship Unloader Unloading System
Wharf Transit System - Spiral Ship Unloader Unloading System
Introduction
1.Ship Unloading The dust produced in the process of powdery material transportation is a difficult problem that has been plaguing people for a long time. Our screw ship unloader solves this problem perfectly. According to the ship size, site conditions, etc.,the recommend ship unloaders are as follows : Ship size ≤3000DWT, it is recommended to use fixed ship unloader of which the capacity is within 300t/h. Ship size >3000DWT, it is recommended to use rail-type mobile ship unloader of which the capacity is above 300t/h. 2.Transportation The conveying equipment is mainly used to transport materials from the wharf to the storage silo. The commonly used conveying equipment includes air chute, belt conveyor, bucket elevator and so on. Our recommended selection principle is that choose air chute for short-distance transportation, because the chute has the advantages of low cost, convenient maintenance, less dust point and low energy consumption; choose belt conveyor for long-distance transportation, because the belt conveyor layout is simple, without multi-stage lifting; choose lifting equipment according to specific project situation. 3.Storage Powdery materials are generally stored in steel silos. According to the specific situation of customers’ projects, bolted steel silo, welded steel silo or spiral steel silo is optional. The discharging form of silo bottom is divided into multi-point discharge and single-point discharge. In addition, it is advisable to add an aeration box or increase hopper angle to totally discharge material out of silo. 4.Distribution According to customers’ needs, bulk loader can be used to load bulk materials into powder tanker truck. The height of the bulk loading platform is generally 5.5-6m. According to the height silo bottom, the dust collector can be directly arranged on the edge of bulk loader or on top of the silo through the air duct. Coal, clinker and ore wharf transit system For coal, clinker, ore and other bulk materials, according to the material particle size, abrasion, water content and transport ship load, grab ship unloader, screw ship unloader and scraper ship unloader unloading systems are optional. 
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000