Ore Powder Steel Silo
The ore powder silo is primarily utilized for storing phosphate rock powder, kaolin, feldspar powder, slag powder, limestone powder, iron concentrate, and other materials.






























Introduction
Ore powder is the product of ore crushing and processing, serving as the initial stage of ore processing and smelting. With a relatively high density ranging from 1.1 to 3.3t/m³, ore powder is typically stored in silos after processing, and distributed either via bulk trucks or train loading stations.
Advantages
-
01Structural SafetyModeling and calculation of silo structures to ensure their safety.
-
02Excellent Storage QualityThe silo is well-sealed, ensuring a long storage period.
-
03Effortless DischargeGasification discharge with a high discharge rate.
-
04High-QualityThe steel is supplied by top 500 suppliers in the world, ensuring its quality.
-
3D Display -
Precision Manufacturing -
Smooth Discharge System -
Precision Manufacturing -
Outstanding Performance -
Intelligent Control
SILO TYPE SELECTION
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Powder Grinding StationPower grinding station is an indispensable device in powder production line, which is used to grind limestone, slag, steel slag, fly ash and so on into fine powder. It is widely used in high-quality cement mixing, large volume concrete and commercial concrete mixing station, high performance concrete, marine engineering, wharf, reservoir, tunnel engineering and so on.
View More -
Concrete Mixing StationConcrete mixing station is a building material manufacturing equipment composed of mixing host, material weighing system, material conveying system, storage system, control system and other ancillary facilities. It can make concrete which is put into construction and production as building materials, by mixing cement, sand, lime and other raw materials.
View More
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
South Korea Slag Cement Mixing System for POSCOThis is a POSCO Group slag cement mixing project contracted by Manxing. This project is an overseas EPC general contracting project. The design, supply and construction of the project are all completed by our company.Slag powder, cementSlag (1000 tons)/cement (3000 tons)Spiral silo, Bolted silo -
Baowu 3x5,000T Steel Slag Powder Steel Silos ProjectThe project is a domestic project undertaken by Manxing. It is 3 sets of spiral steel silos with a total storage capacity of 15,000t for the storage and disposal of steel slag powder at BAOWU Wuhan Metal Resources Limited CompanySteel Slag Powder15,000 tonsSpiral steel silo -
Hubei-JUHAI Environment Ceramsite and Phosphogypsum Storage Packaging ProjectThis project is the Phase II of the silo project of phosphogypsum solid waste industry of Hubei JUHAI Environment, which is the first ceramsite and phosphogypsum storage and packaging engineering project constructed by our company.Phosphogypsum6Small welded steel silo
WHY MANXING SILO
Our vision is to be international respected brand in the field of bulk materials storage and transportation field; Technology builds the beauty of project is our product and service principles; High-standard, globalized and to be an internationalized brand are our business philosophy.
-
ABOUT ManxingHENAN Manxing Silo Engineering Co., Ltd. is China leading reputable EPC Contractor for bulk materials storage silo project, closed storage yard, and bulk material port handling project for cement, clinker, fly ash, coal, slag powder, sand and gravel aggregate, grain, etc.
-
Manxing TECHNOLOGYManxing focuses on scientific and technological research, currently we have 100+ patented technologies, among which 10 are invention patents. Manxing has a team of experienced technical engineers which can design the silo solution according to the project details.
-
Manxing PROJECT EXPERIENCEWe have built projects in more than 40 countries and regions, with more than 900 sets of steel silos and over 3 million tons of materials storage capacities, Manxing quality and reputation are highly recognized by global users.
-
Manxing MISSIONTo serve global customers in the field of bulk materials storage and transportation, with safe, reliable and professional EPC solution that represents China's top level capacity on engineering design, equipment manufacturing and project management standards.
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +

Engineering Experience and Clients
-
40+Countries
-
100+Technical patents
-
3000000TMaterial storage capacity
-
900+Silo projects
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.























