Weighing Module

Weighing module is a weighing device that supports the weighing sensor on the hopper. It can measure the weight of materials in the hopper, convert it into a digital display through an intelligent instrument, display the weight and material level, and output relevant high and low material level signals for control and display.
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Weighing Module
Introduction
Weighing module can be divided into two categories: Static load weighing module: it is mainly suitable for static load weighing occasions with small side force. It can be conveniently installed on various containers. Dynamic load weighing module: it is mainly applicable to mechanical devices that bear horizontal forces, such as assembly line, conveyor belt, etc. In addition, it can also be used for the transformation of mechanical platform scale.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000