Centralized Control System
Manxing company has industry-leading experience in terms of automatic control system design. Our advanced automatic control scheme design realizes equipment status monitoring and control, and our reasonable sensor configuration achieves dynamic and static data management in the process of material storage and transportation. Also, Manxing can make specific scheme design according to user's individual needs.
Introduction
DCS with high performance and long service life: running speed is ultra-high, basic instruction needs 0.08μs, average trouble-free continuous operation time is 300,000 hours, and performance is reliable; Human Machine Interface: wide viewing angle, high-speed response, and reliable performance; Module: 500μs high speed conversion, 1/20,000 resolution. Advantages With automatic, semi-automatic, and manual working modes, and one-key completion of the production experience parameters, it is convenient and fast; The production process and unloading sequence can be defined by users according to actual production needs and operation habits; All-round online real-time monitoring of equipment production status, and safety interlocking control. In case of abnormal working conditions, it can accurately indicate the equipment fault point to remind the staff to check and repair, to achieve fault positioning and elimination; Adopting Internet of Things and cloud technology, it is intelligently connected with the remote industrial control computer and the mobile terminal to realize convenient and fast remote debugging, remote monitoring, remote upgrading and remote operation and maintenance.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.























.jpg)








