Tgd-Type Wire Belt Bucket Elevator

TGD-type wire belt bucket elevator has the features of large conveying capacity, high lifting height, small size, low power consumption, stable and reliable operation and long service life. It is suitable for vertical lifting of dry bulk materials with temperature ≤130℃.
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
Introduction
TGD-type wire belt bucket elevator is suitable for vertical lifting of dry bulk materials or small granular materials, and widely used in bulk materials lifting system in building materials, metallurgy, chemical, food, power and other industries. It is an ideal equipment for replacing foreign products with the same specifications. There are 10 basic models of TGD-type wire belt bucket elevator: TGD315、TGD400、TGD500、TGD630、TGD800、TGD800H、TGD1000、TGD1250、TGD1400、TGD1600.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000