Coal Mine
In the process of coal production, the traditional open-air storage of coal, loading of artificial loader are gradually phased out due to serious pollution and low efficiency. Manxing provides customers with large coal storage silo, rapid loading system, rapid and quantitative loading system, long distance belt conveyor, and other solutions.
-
Coal Storage
Generally, enclosed coal storage warehouse and coal storage silo are used to store coal. The enclosed coal storage warehouse is completely closed with a spherical reticulated shell at its top. Manxing coal storage warehouse is equipped with spray dust suppression system, which is safe and pollution-free; and it has stable steel grid structure, low cost, and large coal storage capacity. The diameter of a coal storage warehouse can reach 120m, and the reserves of coal storage warehouses are in the range of 2-200,000 tons. Coal storage silo is applicable to the occasions of limited site and small reserves. Manxing coal storage silo is steel silo, with single silo storage capacity in the range of 0.5-30,000 tons, which has advantages of small footprint, low investment cost and short construction period. -
Rapid Loading System
Rapid loading system is used for quick loading of trucks. The rapid loading system is composed of belt conveyor, buffer silo, rapid loading chute, control gate, hydraulic system, dust collection system, water mist dust suppression system, silo monitoring system and electrical control system. According to customers’ needs, Manxing rapid loading system can be configured with single-lane, two-lane, four-lane loading station systems with instantaneous loading capacity of 1t/s. The water mist dust suppression in the loading process, achieves efficient and environmental loading operation, bringing economic benefits to customers. -
Rapid and Quantitative Loading System
Rapid and quantitative loading system is used for rapid and quantitative loading of trains. It is the most advanced coal, ore and bulk materials railway loading method which can realize continuous, dynamic, rapid, quantitative and accurate loading of trains by batching in quantitative silo in advance according to standard weight, and then unloading them quickly to the moving train. Manxing rapid and quantitative loading system can complete loading operation in the process of train moving, loading speed is less than 45 seconds per carriage, measurement accuracy is high, single loading accuracy can reach 0.1%, and the whole train loading accuracy can reach ±0.05%.
Typical process layout
-
Fast Loading System -
Coal Mine Storage
SILO TYPE SELECTION
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +

Engineering Experience and Clients
-
40+Countries
-
100+Technical patents
-
3000000TMaterial storage capacity
-
900+Silo projects
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
Large Welded Steel Silo -
Spiral Steel Silo -
Large Bolted Steel Silo -
Small Bolted Steel Silo -
Belt Conveyor -
Dust Collector -
Intelligent Silo Storage Management System -
Rapid & Quantitative Truck Loading System -
Pakistan Truck Loading Station ProjectManxing undertook the supply of 2x5000t loading station and supporting facilities. Manxing completed the overall engineering design of the project and the structure and construction design of the 2x5000 tons concrete silo and a local company completed construction. Other mechanical and electrical equipment were designed, supplied and installed by Manxing.Coal2x5000 tonsConcrete silo -
6x10,000T Welded Clinker Silo System for San Miguel CorporationThis project is San Miguel Corporation, Davao, the Philippines 10x10000 tons steel silos system contracted by Manxing. Among which, there are six clinker steel silos.Clinker60,000 tonsLarge welded steel silo -
Indonesia 6,000T Cement Steel Silo Project for SIGThis is a cement transfer project, of which the owner is SIG, the largest cement producer in Indonesia.Cement6000 tonsSpiral silo
Please feel free to give your inquiry in the form below.
We will reply you in 24 hours.








