Radar Level Meter

Radar level meter beam energy is low, so it can be installed in a variety of metal, non-metal containers or pipelines, for non-contact continuous measurement of liquid, slurry and particle level.
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Radar Level Meter
Introduction
Radar level meter does no harm to human body and environment. It is not affected by the specific gravity of medium and the change of dielectric constant, and it does not need to be adjusted on site. 1.It has small beam angle, concentrated energy, stronger anti-interference ability, and high measurement accuracy and reliability; 2.Its measuring blind area is smaller and wavelength is shorter. It can be used for the measurement of various complex conditions; 3.Its antenna size is small, it is easy to install, and it is solid, durable and maintenance-free; 4.Measurement is unaffected by temperature, pressure and dust; 5.Non-contact radar, no wear and pollution.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000