Aluminum Industry
Bulk Material Storage & Transportation Solutions
Aluminum Industry
In the field of aluminum industry, Manxing provides customers with: alumina storage steel silo, silo roof homogenization system, silo bottom gasification discharge system, air chute conveying system, ultra-dense phase conveying system of electrolytic aluminum plant, etc.
Storage and Transportation System of Alumina Plant
Storage and Transportation System of Alumina Plant
The storage and transportation system of alumina plant is used to transfer the alumina produced by the aluminum hydroxide calcinator to the alumina storage silo through the air chute, bucket elevator, silo roof distributor, etc. According to customers’ requirements, Manxing can provide welded steel silos, and spiral steel silos. Manxing alumina storage and transportation system is fully applicable to the characteristics of high abrasion of alumina, with low storage and transportation system investment and operation cost, low alumina breakage rate, and smooth discharge without plugging. Operating equipment is fully sealed, and has a long service life.
Ton Bag Packaging System of Alumina Plant
Ton Bag Packaging System of Alumina Plant
The alumina from the alumina storage silo is transported to the buffer silo above the ton packing machine through the air chute. After being packed by the ton packing machine, the alumina is transported out through the chain plate conveyor. Manxing ton bag packing machine is highly automated, as it is equipped with microcomputer scale, so its packing accuracy is ±0.5%, and its packing capacity is ≥40 bags /h. Ton bag packing machine has characteristics of stable performance, high packing precision, and fast speed. Advanced dustproof and dust removal design can reduce the dust pollution in the working environment. Weighing system adopts comprehensive plate digital adjustment and parameter setting, with high sensitivity.
Storage and Transportation System of Electrolytic Aluminum Plant
Storage and Transportation System of Electrolytic Aluminum Plant
The storage and transportation system of electrolytic aluminum plant solves the problems of alumina storage and alumina feeding to electrolytic cell in electrolytic workshop. Alumina is transported to the alumina silo through a bucket elevator or belt conveyor, and the alumina is uniformly discharged into the silo through the silo roof homogenization device. The alumina in the alumina silo is transported to the electrolytic cell tank in the electrolytic workshop through the air chute conveying system. Manxing storage and transportation system of electrolytic aluminum plant adopts the segmented transportation process, with stable system operation and high feeding efficiency.
Name:
*Email:
Tel/Whatsapp:
*Message:
Typical process layout
Storage System of Alumina Plant
Storage System of Alumina Plant
Alumina Ton Bag Packaging System
Alumina Ton Bag Packaging System
SILO TYPE SELECTION
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +
Certifications
Engineering Experience and Clients
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Client
Client
Client
Client
Client
Client
Client
Client
EPC SERVICE
Engineering Consultation
Engineering Consultation
Engineering Design
Engineering Design
Equipment Manufacturing
Equipment Manufacturing
Project Construction
Project Construction
Installation Debugging
Installation Debugging
Operation Management
Operation Management
Please feel free to give your inquiry in the form below.
We will reply you in 24 hours.
Name:
*Email:
Tel/Whatsapp:
*Message:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000