Pneumatic Conveying System
Material Handling System
Bulk Material Storage System Material Handling System Intelligent Control System
Pneumatic Conveying System
Pneumatic conveying is an important part of clean production. It mainly transports the stored materials to the designated position through sealed pipelines. It has the characteristics of high conveying efficiency, less land occupation, economy, environmental protection, and no pollution.
Positive-Pressure Dense-Phase Pneumatic Conveying System
Positive-Pressure Dense-Phase Pneumatic Conveying System
Main equipment of positive-pressure dense-phase pneumatic conveying includes : silo-type conveying pump, air compressor, pneumatic rotary feed valve, ceramic lined wear-resistant elbow, electrical control system, etc.
Positive-Pressure Dilute-Phase Pneumatic Conveying System
Positive-Pressure Dilute-Phase Pneumatic Conveying System
Positive-pressure dilute-phase pneumatic conveying system and positive-pressure dilute-phase conveying system are pneumatic conveying with pneumatic conveying pressure ≤ 100 kPa, and conveying distance ≤ 200 m.
Negative-Pressure Suction Pneumatic Conveying System
Negative-Pressure Suction Pneumatic Conveying System
Negative-pressure suction pneumatic conveying system relies on the air flow that has a lower pressure than the outside atmospheric pressure to carry materials along the flow line in the tube for conveying.
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000