Fly Ash Separation System
The raw ash or coarse ash discharged from coal-fired power plant is ground, dried and separated to achieve the fineness of finished ash, realize the comprehensive utilization of fly ash, and improve the economic benefit.
-
Fly Ash Separation SystemThe fly ash stored in raw ash silo is discharged into air chute through silo bottom unloading device. After being lifted by a bucket elevator, it enters a separator for separation. Under the action of the separator, the fly ash of different particle sizes is separated.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More