Silo Types
According to different construction methods and storage capacity requirements, silos can be divided into welded steel silo, spiral steel silo, bolted steel silo, concrete silo and other types.
-
Concrete SiloConcrete silos are constructed with cast-in-place reinforced concrete structures, representing a traditional and mature silo type. -
Spiral Steel SiloSpiral silo refers to a silo constructed by spiraling the steel plate with a certain width into the rolling equipment during construction. -
Large Welded Steel SiloThe large welded steel silo, primarily constructed of steel, is a silo type independently developed in the continuous evolution of the national steel silo industry. It is suitable for storing bulk materials such as cement, clinker, and fly ash. -
Aluminum SiloIn fields such as the petrochemical industry, aluminum silos have become ideal choices for storing granular raw materials such as PVC, PE, PP, LDPE, and PET due to their corrosion resistance, light weight, sealing, and environmental protection. They have more advantages than traditional storage silo systems and can meet the needs of enterprises for the efficiency and sustainability of storage systems. -
Small Bolted Steel SiloSmall bolted steel silos are suitable for concrete mixing plants, small processing plants, small construction sites, and temporary works. -
Large Bolted Steel SiloA large bolted steel silo is a bulk material storage structure composed of steel plates assembled on site. All components are prefabricated in the factory and transported to the project site, where the entire structure is assembled through bolted connections.
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in power plant boilers. It is a fine powder that is a byproduct of burning pulverized coal in electric generation power plants. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Bulk Material StockyardBulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
View More





