Discharge System
According to the different characteristics of storage materials, silo types and storage capacity, design the most suitable discharge method, which has high discharge rate, high degree of automation and low cost.
-
Flat Bottom Silo DischargingAt present, flat bottom silo discharging adopts gasification discharge and multi-point discharge. -
Hopper Bottom Silo DischargingHopper bottom silo discharging methods include gravity induced discharge, vibration discharge and gasification discharge.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More





