Silo System
Silos can be used to store all kinds of bulk materials. They are often used in cement plants, thermal power plants, grinding stations, transfer terminals and other industries because of their durability, low cost, high degree of automation and wide application range.
-
Plastic Particle Steel SiloPlastic Particle Steel Silo is primarily utilized for storing plastic particles such as polypropylene, polyethylene, polystyrene, polyvinyl chloride, ABS, and nylon.Silo Type:Bolted steel siloApplication:Construction materials, chemical industry, machinery industry, etc. -
Hydrated Lime Silo System SolutionLime silo system is a common method for the lime storage and transportation industry. Manxing has two common silos types: Welded Steel Silo and Spiral Silo to store hydrated lime. Hydrated lime silo system includes steel silos and supporting auxiliary equipment, built for the storage and transportation of hydrated lime, and is widely used in building industry, petroleum industry, etcSilo Type: Welded Steel Silo, Spiral Sealing Steel SiloApplication:Building Materials, Petroleum Industry, Raw Materials for Industry, etc.Storage Capacity:200 - 30000 TonsStorage Material: Lime, Hydrated Lime, etc. -
Pulverized Coal Steel SiloCompared with raw coal, pulverized coal has a smaller particle size, a larger surface area, and a certain level of explosiveness.Silo Type:Welded steel siloApplication:Power plants -
Alumina Steel SiloAlumina powder is produced through the Bayer process and is primarily used in the production of electrolytic aluminum, ceramics, and refractory materials. It is a white powder with good fluidity and low density.Silo Type:Spiral steel siloApplication:Ceramics, medicine, electronics, machinery and other industries -
Cement SiloCement production enterprises need store cement to balance the supply and demand of cement in low and peak seasons for cement production.Silo Type:Welded steel silo,Spiral steel siloApplication:Cement plants, cement transfer centers, concrete mixing plants, etc. -
Ore Powder Steel SiloThe ore powder silo is primarily utilized for storing phosphate rock powder, kaolin, feldspar powder, slag powder, limestone powder, iron concentrate, and other materials.Silo Type:Spiral steel silo,Bolted Steel SiloApplication:Construction materials, metallurgy, chemical and construction industries -
Fly Ash SiloFly ash can be used in the production of building materials, and its recycling can reduce pollution and increase economic benefits. Therefore, the storage of fly ash is crucial.Silo Type:Welded steel siloApplication:Power station, fly ash transit center, concrete batching plant -
Petroleum Coke Silo SystemPetroleum coke steel silos are manufactured using advanced technology based on the characteristics of petroleum coke, perfectly solving the core issues of moisture, dust and fire prevention during the storage of petroleum coke. Our petroleum coke steel silos are widely used in petrochemical, electric power, metallurgy, carbon and other industries, providing customers with safe, economical and efficient storage solutions. -
Clinker SiloClinker silo is one of the important structures in cement plants. Due to the different plant sizes, single silo storage capacity ranges from 2000t to 50,000tSilo Type:Spiral steel silo,Welded steel siloApplication:Cement mill plant, clinker transit center -
Coal SiloManxing coal silos provide sealed, high-capacity storage for raw coal and washed coal in power plants, cement works and coking plants, with dust control and safe discharge design.Silo Type:Welded steel silo, Spiral steel siloApplication:Power plants, cement plants, coking plants, coal transfer terminalsStorage Capacity:500 - 100,000 TStorage Material:Raw coal, washed coal, screened coal -
Slag SiloManxing slag silos store ground granulated blast-furnace slag and steel slag powder for cement and concrete plants, with moisture protection, abrasion-resistant discharge and environmental compliance.Silo Type:Welded steel silo, Spiral steel siloApplication:Cement plants, concrete mixing plants, steel works, slag grinding stationsStorage Capacity:500 - 80,000 TStorage Material:Ground granulated blast-furnace slag, steel slag powder
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More





