Bulk Material Stockyard
Large-span spacial grid structure is often used in bulk material storage yard, which has the advantages of reasonable stress, light weight, low cost and short construction period. Advanced bulk material stacking and reclaiming, storage, and handling systems are efficient environmental friendly.
-
Circular StockyardCircular stockyard has small land occupation and large storage capacity. It solves the problems of materials loss and flying in the process of piling or taking materials due to wind and rain. -
Strip StockyardStrip stockyard is widely used in the coal conveying system of thermal power plants and the production system of coal and metallurgical mines. It can store a variety of materials, and has the advantages of large storage capacity, small loss of multi-material storage, small invalid area of the yard blocks and land saving.
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in power plant boilers. It is a fine powder that is a byproduct of burning pulverized coal in electric generation power plants. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Bulk Material StockyardBulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
View More





