Material Level Monitoring System
Intelligent Control System
Bulk Material Storage System Material Handling System Intelligent Control System
Material Level Monitoring System
3D Level Meter
3D Level Meter
The birth of 3D level meter indicates that the volume and level of the measured material can be accurately displayed by 3D imaging technology in closed or open silos.
Radar Level Meter
Radar Level Meter
Radar level meter beam energy is low, so it can be installed in a variety of metal, non-metal containers or pipelines, for non-contact continuous measurement of liquid, slurry and particle level.
Radio Frequency Admittance Level Meter
Radio Frequency Admittance Level Meter
Radio frequency admittance level meter is a new material level control technology which is anti material hanging, more reliable, more accurate and more broadly applicable. It can detect all materials and is unaffected by material density, particle size, chemical composition, deposition viscosity and conductive properties. It is widely used for the control of liquid, powder, slurry, solid and other materials.
Rotary Resistance Material Level Meter
Rotary Resistance Material Level Meter
Rotary-resistance material level meter is also commonly known as rotary-resistance material level switch, which is used to monitor or control the level of powdery and granular materials in open or closed containers. It is widely used in modern industrial production processes and silo storage departments.
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000