Weighing and Metering System
-
Weighing ModuleWeighing module is a weighing device that supports the weighing sensor on the hopper. It can measure the weight of materials in the hopper, convert it into a digital display through an intelligent instrument, display the weight and material level, and output relevant high and low material level signals for control and display. -
Electronic Truck Scale Weighing SystemElectronic truck scale is a new type of electronic weighing instrument, with characteristics of rapid weighing, high accuracy, visual display and complete functions. It is suitable for industry, construction, silo storage and other industries.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
View More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
View More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
View More




