Project Overview
Vietnam 40,000t Clinker Storage Silo
Project Details
| Country | Vietnam |
| Industry | Cement |
| Material | Clinker |
| Capacity | 40,000 tons |
| Commissioning | Concrete curing: 28 days. Refractory installation: 3 weeks. Commissioning with gradual temperature ramp-up over 2 weeks. Performance test confirmed 400 tph extraction rate and stable temperature control. |
Customer Requirement
A 6,000 TPD cement production line required a large clinker storage silo between the cooler and cement mill. Requirements: 40,000t capacity, 200°C design temperature, reinforced concrete construction, automated extraction system, and 20+ year service life.
Engineering Solution
Manxing designed a 40m diameter reinforced concrete silo with refractory lining in the hot zone. The steel roof structure supports the feed conveyor. The discharge system uses a heavy-duty apron extractor (rated 400 tph, 200°C) feeding the cement mill. Thermal expansion analysis and expansion joint design were critical for the 40m diameter structure. The silo includes a water spray cooling system for temperature control.
Project Results
The silo has been in operation since 2020, providing 7 days of clinker storage buffer for the cement mill. The refractory lining condition is excellent after 4 years. The plant has achieved 98% kiln utilization.
More Projects
Related Case Studies
-
Philippines 10,000t Cement Storage ExpansionPhilippines | Cement | 10,000 tonsView Case Study
-
Indonesia Cement Terminal Turnkey ProjectIndonesia | Cement | 20,000 tonsView Case Study
-
India 2x600MW Fly Ash Storage SystemIndia | Fly Ash | 9,000 tonsView Case Study
-
Angola 5,000t Cement Terminal ProjectAngola | Cement | 5,000 tonsView Case Study
Start a Similar Project
Contact our engineering team to discuss your bulk storage requirements
Contact Us

