Project Overview
Angola 5,000t Cement Terminal Project
Project Details
| Country | Angola |
| Industry | Cement |
| Material | Cement |
| Capacity | 5,000 tons |
| Commissioning | Commissioning completed in 4 weeks. Performance test confirmed 80 tph truck loading rate, 24-hour ship unloading cycle, and <15 mg/Nm³ dust emissions. |
Customer Requirement
The client needed a cement import terminal at Luanda port capable of receiving cement from pneumatic ship unloaders and storing 5,000 tons for truck distribution across Angola. Key requirements: rapid ship turnaround (<24 hours), dust-free operation in port area, and reliable 24/7 truck loading capability.
Engineering Solution
Manxing designed and installed 4 x 1,250t bolted steel silos with fluidized bottoms. The system includes: pneumatic ship unloading connection, distribution system to route cement to any silo, multi-zone fluidization for reliable discharge, and two truck loading stations with integrated weighing. The dust collection system achieves <20 mg/Nm³ emissions. The control system enables single-operator management of the entire terminal.
Project Results
The terminal has been operational since 2023, handling 200,000+ tons of cement annually. Ship turnaround time averages 18 hours. Zero dust complaints from port authority. The client has ordered a second phase expansion to 10,000 tons.
Client Testimonial
Manxing delivered our terminal on time and within budget. The system has exceeded our throughput expectations and the dust control is excellent.
More Projects
Related Case Studies
-
Thailand Gypsum Board Plant FGD StorageThailand | FGD Gypsum | 3,000 tonsView Case Study -
Vietnam 40,000t Clinker Storage SiloVietnam | Clinker | 40,000 tonsView Case Study -
Turkey Cement Plant Coal Storage SystemTurkey | Coal | 3,000 tonsView Case Study -
Mongolia Copper Mine Concentrate StorageMongolia | Copper Concentrate | 10,000 tonsView Case Study
Start a Similar Project
Contact our engineering team to discuss your bulk storage requirements
Contact Us