Rust Prevention and Repair Techniques
Maintenance & Safety Manxing Engineering Team 11 min read 2026-08-19
Maintenance & Safety Manxing Engineering Team 11 min read 2026-08-19

Key Takeaways

  • Weld Inspection Timing: Inspect 24-48 hours after welding for delayed cracking.
  • NDT Methods: UT for internal defects, MT/PT for surface cracks.
  • Fatigue-Prone Locations: Shell-to-hopper, connections, and openings.
  • Repair Procedures: Qualified welders and procedures required.
  • Documentation: Weld maps link procedures to locations.

Weld Defect Types

A cement silo in Colombia developed a 200mm crack at the shell-to-hopper connection after 8 years of service. The crack started at a lack-of-fusion defect from original fabrication. We repaired it with full-penetration weld after gouging out the defect. That $35,000 repair taught us: original fabrication quality determines long-term reliability.

Common weld defects: Porosity (gas pockets in weld). Lack of fusion (incomplete bonding). Undercut (groove at weld toe). Cracking (hot or cold cracks). Slag inclusions (trapped flux). Underfill (insufficient weld metal).

Non-Destructive Testing

Visual inspection: 100% of welds visually inspected. Check for surface defects, undercut, and profile. Use weld gauges for size verification. Document with photos for critical welds.

Volumetric testing: Ultrasonic testing (UT) for internal defects. Magnetic particle (MT) for surface cracks in steel. Penetrant testing (PT) for non-ferrous materials. Radiographic testing (RT) for critical welds. Test percentage per code requirements (typically 10-25%).

Fatigue and Crack Management

Fatigue-prone locations: Shell-to-hopper connection (stress concentration). Nozzle and opening reinforcements. Platform and ladder connections. Stiffener-to-shell welds. Erection lug attachment points.

Crack evaluation: Measure length and location. Determine if active or arrested. Assess stress conditions at crack location. Evaluate remaining structural capacity. Decide on repair or monitor approach.

Repair Welding

Repair preparation: Remove defect completely by grinding or gouging. Verify defect removal with MT or PT. Prepare weld groove with proper profile. Preheat per welding procedure requirements.

Repair execution: Use qualified welders and approved procedures. Control interpass temperature. Apply post-weld heat treatment if required. Inspect repair with same method as original. Document repair location on weld map.

Frequently Asked Questions

Q: How often should welds be inspected?

A: Visually inspect annually. Perform NDT on critical welds every 5 years or after any unusual loading event.

Q: Can cracks be monitored instead of repaired?

Need weld inspection? Manxing provides NDT services and repair supervision. Request Weld Assessment

Need Engineering Support?
Talk to our engineers about your specific requirements
Talk to an Engineer
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000