Project Overview
Indonesia Cement Terminal Turnkey Project
Project Details
| Country | Indonesia |
| Industry | Port & Terminal |
| Material | Cement |
| Capacity | 20,000 tons |
| Commissioning | Turnkey project delivered in 14 months from contract signing. Commissioning included performance testing: 400 tph ship unloading, 24-hour turnaround, <20 mg/Nm³ dust. |
Customer Requirement
A new cement import terminal in Surabaya required a complete turnkey solution: ship unloader, conveying, storage, and truck loading. Requirements: 400 tph throughput, 20,000t storage, fully automated operation, and 24-hour ship turnaround.
Engineering Solution
Manxing delivered the complete terminal on a turnkey basis. The system includes: pneumatic ship unloader (400 tph), covered belt conveyors, 4 x 5,000t welded steel silos with fluidized bottoms, and 4 truck loading stations. The fully automated control system manages ship unloading, silo routing, and truck loading with minimal operator intervention. The dust collection system serves all transfer points.
Project Results
The terminal handles 500,000+ tons of cement annually. Ship turnaround averages 20 hours. The automated system requires only 3 operators per shift. The client has expanded with a second terminal in Jakarta.
More Projects
Related Case Studies
-
Mongolia Copper Mine Concentrate StorageMongolia | Copper Concentrate | 10,000 tonsView Case Study
-
Vietnam 40,000t Clinker Storage SiloVietnam | Clinker | 40,000 tonsView Case Study
-
Philippines 10,000t Cement Storage ExpansionPhilippines | Cement | 10,000 tonsView Case Study
-
UAE Concrete Batching Plant Sand StorageUAE | Sand | 2,000 tonsView Case Study
Start a Similar Project
Contact our engineering team to discuss your bulk storage requirements
Contact Us