Project Overview
UAE Concrete Batching Plant Sand Storage
Project Details
| Country | UAE |
| Industry | Concrete Batching |
| Material | Sand |
| Capacity | 2,000 tons |
| Commissioning | Commissioning included batching accuracy testing (±1% target), dust measurement, and system integration. All 4 plants commissioned within 3 months. |
Customer Requirement
A large ready-mix concrete company in the UAE needed sand storage silos for 4 batching plants. Requirements: mass flow discharge, wear protection, automated batching integration, and dust control for urban locations.
Engineering Solution
Manxing provided 4 x 500t bolted steel silos with mass flow hopper design (65° cone angle). The silos feature ceramic tile lining in the hopper section. Each silo is equipped with a slide gate and belt feeder for controlled discharge to the batching system. The dust suppression system uses water mist at transfer points. The batching system is fully automated with recipe management.
Project Results
The batching plants produce 2 million m³ of concrete annually. The silos have eliminated the need for open sand storage yards, reducing land use by 60% and eliminating sand contamination from wind-blown dust.
More Projects
Related Case Studies
-
China Compounding Plant Plastic Pellet StorageChina | Plastic Pellets | 1,200 tonsView Case Study -
Vietnam 40,000t Clinker Storage SiloVietnam | Clinker | 40,000 tonsView Case Study -
Brazil Slag Grinding Station StorageBrazil | GGBFS | 10,000 tonsView Case Study -
Angola 5,000t Cement Terminal ProjectAngola | Cement | 5,000 tonsView Case Study
Start a Similar Project
Contact our engineering team to discuss your bulk storage requirements
Contact Us