Project Overview
China Compounding Plant Plastic Pellet Storage
Project Details
| Country | China |
| Industry | Chemical |
| Material | Plastic Pellets |
| Capacity | 1,200 tons |
| Commissioning | Clean commissioning with virgin material for each silo. Cross-contamination testing (material changeover) confirmed zero contamination. Automated routing system tested with all 6 materials. |
Customer Requirement
A plastics compounding plant needed storage for 6 different plastic resins (PP, PE, ABS, PA, PC, PBT) with zero cross-contamination. Requirements: dedicated silos per material, nitrogen blanketing for hygroscopic resins, automated material routing, and dust-free operation.
Engineering Solution
Manxing provided 6 x 200t stainless steel (304) silos with polished internal surfaces (Ra < 0.8 μm). Each silo has dedicated pneumatic conveying lines. The 3 hygroscopic resins (PA, PC, PBT) have nitrogen blanketing. The automated routing system uses a centralized control system to direct each material to the correct compounding extruder. The dedusting system removes fines and angel hair.
Project Results
The system handles 50,000 tons of plastic pellets annually with zero cross-contamination incidents. Material changeover time reduced from 4 hours to 30 minutes. The compounding plant achieved ISO 9001 certification with the new storage system.
More Projects
Related Case Studies
-
Philippines 10,000t Cement Storage ExpansionPhilippines | Cement | 10,000 tonsView Case Study -
Indonesia Cement Terminal Turnkey ProjectIndonesia | Cement | 20,000 tonsView Case Study -
Mongolia Copper Mine Concentrate StorageMongolia | Copper Concentrate | 10,000 tonsView Case Study -
Saudi Arabia Water Treatment Lime StorageSaudi Arabia | Quicklime | 1,000 tonsView Case Study
Start a Similar Project
Contact our engineering team to discuss your bulk storage requirements
Contact Us