Manxing has an engineering and technical team composed of experienced and excellent engineers in the field of bulk storage and transportation. Manxing has 7 Senior Engineers, 28 First-Class Certified Architects, First-Class Certified Structural Engineers, First-Class Certified Constructors, 45 Professional Technicians with intermediate professional titles or above, and 21 technical and management personnel with doctoral or master's degrees or above.
Manxing focuses on technology optimization and new technology research and development, and has new research results every year such as patents, software copyrights, papers and technological innovations. At present, Manxing has more than 100 patented technologies, including 12 invention patents.
Manxing focuses on technology optimization and new technology research and development, and has new research results every year such as patents, software copyrights, papers and technological innovations. At present, Manxing has more than 100 patented technologies, including 12 invention patents.
Manxing has three manufacturing and processing bases, covering an area of more than 590,000 square meters, with blanking workshop, mechanical processing workshop, riveting workshop, cold working stamping workshop, steel structure welding workshop, assembly workshop, painting workshop and electrical assembly workshop.
Our production department strictly follows the ISO9001 quality system standard and strictly controls the product defect ratio in all production processes. At the same time, we will constantly update advanced equipment and production lines to improve product quality and performance.
Manxing has established a systematic and strict supplier selection and identification system and a perfect dynamic supplier assessment system. Only the TOP10 suppliers in the industry will be selected for the purchase of special equipment. Also, Manxing has established a perfect supervision management system. In the process of processing and manufacturing, Manxing's quality control engineers will go deep into the production line to ensure that the processing quality is strictly consistent with the technical requirements.
Manxing has EPC general contracting qualification for engineering projects, and is a bulk materials storage and transportation engineering general contractor which has the most comprehensive certifications in China. Manxing has qualifications of general contracting for construction project, general contracting for mechanical and electrical project, specialized contracting for steel structure project and architectural engineering design.
Manxing carries out construction, inspection and acceptance of projects in strict accordance with design drawings, specifications, acceptance standards and relevant local provisions. Construction quality, safety, environmental protection meet the requirements of the national standards, the quality of projects meet the excellent standard.
For projects that only need technical services, Manxing provides scientific construction organization and management suggestions for owners to reduce construction costs and improve construction efficiency.


