Cement Industry
In each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
-
Cement Storage and Transportation System
Manxing provides customers with welded steel silos, bolted steel silos, spiral steel silos and other structural types of finished cement silos. Manxing cement steel silo has characteristics of good sealing performance, short construction period, small footprint, and low construction and operation cost. Manxing can design various types of silos of which single silo storage capacity is 0.1-30,000 tons to meet customers’ needs. The cement silo is equipped with a fluidization discharging system to achieve the homogenization of cement in the process of cement feeding and discharging. Manxing provides customers with system solutions and services for cement storage and transportation, bulk loading of tank truck, and bag packaging, etc. -
Clinker Storage and Transportation System
You can use steel silos, high wall silos and tent-shaped warehouse to store clinker. The storage capacity of a steel silo is 1-50,000t, and the silo body is steel structure. It is characterized by small footprint, short construction period and low construction cost. The storage capacity of a high wall silo is 1-100,000t, the silo wall is reinforced concrete retaining wall, and the silo roof is grid structure. It is characterized by small footprint, and large storage capacity. The tent-shaped warehouse is conical, consisting of the bottom concrete retaining wall and steel structure grid frame. The advantages of the warehouse are good cooling effect and low requirements for bearing capacity of the foundation. -
Cement Mixing System
Cement mixing system has three main subsystems: Slag powder and limestone powder and OPC powder storage system; Slag powder and limestone powder and OPC powder mixing and stirring system; Finished cement feeding and discharging system. The cement mixing system can produce many kinds of cement by mixing different materials such as slag powder, fly ash, limestone powder and cement. Manxing cement mixing system has features of low construction cost, short construction period and high precision of continuous metering mixing, which can bring significant economic benefits to customers.
Typical process layout
-
Cement Storage and Transportation System -
Clinker Storage and Transportation System
SILO TYPE SELECTION
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +

Engineering Experience and Clients
-
40+Countries
-
100+Technical patents
-
3000000TMaterial storage capacity
-
900+Silo projects
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
Large Welded Steel Silo -
Spiral Steel Silo -
Large Bolted Steel Silo -
Small Bolted Steel Silo -
Tgd-Type Wire Belt Bucket Elevator -
Strip Stockyard -
Truss -
Packing Machine -
6x10,000T Welded Clinker Silo System for San Miguel CorporationThis project is San Miguel Corporation, Davao, the Philippines 10x10000 tons steel silos system contracted by Manxing. Among which, there are six clinker steel silos.Clinker60,000 tonsLarge welded steel silo -
Hubei-JUHAI Environment Ceramsite and Phosphogypsum Storage Packaging ProjectThis project is the Phase II of the silo project of phosphogypsum solid waste industry of Hubei JUHAI Environment, which is the first ceramsite and phosphogypsum storage and packaging engineering project constructed by our company.Phosphogypsum6Small welded steel silo -
Indonesia 6,000T Cement Steel Silo Project for SIGThis is a cement transfer project, of which the owner is SIG, the largest cement producer in Indonesia.Cement6000 tonsSpiral silo