Bulk Material Terminal
Bulk Material Storage & Transportation Solutions
Bulk Material Terminal
The development of global trade integration has promoted the global demand for bulk material transportation. The sea transportation volume of bulk cargo is increasing rapidly. With the development of sea transportation, loading, unloading and transfer of bulk materials in the terminal play a huge role in the field of bulk material terminal, and bring benefits to customers.
Ship Unloading System
Ship Unloading System
Terminal ship unloading system mainly consists of ship unloader, conveying equipment, intermediate storage silo and dust removal system. Manxing provides terminal planning, bulk material unloading and transfer and other complete solutions for customers. According to customers’ requirements, it can be equipped with grab-type ship unloader + dust-free hopper ship unloading system, screw-type ship unloader + air chute ship unloading system, etc. Manxing terminal unloading system is designed and planned according to specific projects, applicable to various bulk materials, different ship types and the requirements of unloading capacity of 150-2000t/h.
Ship Loading System
Ship Loading System
The loading system mainly consists of silos, conveying equipment, ship loaders and auxiliary systems. Welded steel silos and spiral silos can be used. According to different needs of customers, the equipment used in the loading system includes air chute, belt conveyor, mobile ship loader, fixed ship loader, dust collector, electrical control system, etc. Conveying equipment is mainly composed of air chute and belt conveyor. Based on customers’ demands, Manxing can provide shipping systems with capacity of 150-600t/h.
Terminal Loading and Distribution System
Terminal Loading and Distribution System
Terminal loading and distribution system is used for loading bulk materials unloaded from ship on truck directly. It mainly includes ship unloader, air chute, bulk loader and dust collection system. The cement is transported to the air chute by the ship unloader, and then loaded directly into the cement tank truck by the bulk loader. The system is simple and efficient. By controlling the chute discharge valve, you can switch feeding and loading operation of two bulk loaders to realize continuous ship unloading and loading. Manxing terminal loading and distribution system is designed according to customers’ needs, with characteristics of simple process, flexible layout, and low investment cost.
Name:
*Email:
Tel/Whatsapp:
*Message:
Typical process layout
Wharf Loading Distribution System
Wharf Loading Distribution System
Ship Unloading System
Ship Unloading System
SILO TYPE SELECTION
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +
Certifications
Engineering Experience and Clients
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Client
Client
Client
Client
Client
Client
Client
Client
EPC SERVICE
Engineering Consultation
Engineering Consultation
Engineering Design
Engineering Design
Equipment Manufacturing
Equipment Manufacturing
Project Construction
Project Construction
Installation Debugging
Installation Debugging
Operation Management
Operation Management
Please feel free to give your inquiry in the form below.
We will reply you in 24 hours.
Name:
*Email:
Tel/Whatsapp:
*Message:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000