Contact

Truck Loader

Mobile bagged cement truck loader is the key equipment used in the bagged cement loading process in cement production enterprises. The equipment has a high automation degree, so the whole loading process of unloading bags from the upper part of vehicles can be completed by one person.
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Truck Loader
Introduction
The movement and operation of mobile bagged cement truck loader are convenient in any situation. Especially in the situation that there is no loading and unloading platform, it is convenient and fast for loading and unloading. The inclination section automatically adjusts the height, and the front retractable roller table can freely adjust the length in the horizontal state, making the conveying operation more flexible. At the same time, it can be widely used in fertilizer, food and other industries, for bagged packaging products delivery and loading operations. The selection of longitudinal moving distance of mobile bagged cement truck loader, namely loader travel distance, should be based on installed truck type. Generally, the length of a truck carriage is 7~12m, so 7~12m of longitudinal moving distance of a truck loader can satisfy requirements. It can save the loading labor, improve the loading efficiency, and reduce bag breaking in the process of handling, loading and unloading.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000