Chemical Plant
Bulk Material Storage & Transportation Solutions
Chemical Plant
In the chemical industry, Manxing's products are widely used for mixing and storing plastic particles and plastic additives.
Ton Bag Unpacking Device
Ton Bag Unpacking Device
Ton bag unpacking device is used for unpacking and unloading of ton bag material. It is composed of lifting frame, electric hoist, ton bag hanger, flapping device, unloading hopper, etc. Based on customers’ requirements, it can be sealed and equipped with dust collector, widely used in bag unpacking of powdery or granular materials, powder and particle mixtures and flake materials such as plastics and plastic additives. Manxing ton bag unpacking device has the characteristics of high unpacking efficiency, convenient operation and no dust pollution.
Stainless Steel Silo
Stainless Steel Silo
Manxing stainless steel silo roof, silo body, cone, and pipes are made of 304 or 316 stainless steel, and silo support is made of Q355B material. Stainless steel silo can be equipped with material level meter, dust collector, pressure release valve, weighing instrument, etc. Manxing has rich experience in the design and construction of steel silo, so it can provide various specifications of silos with volume of 10 m3-10000 m3. Manxing silo is widely used in chemical industry, medicine, and food industries for material storage, and it has the advantages of good sealing, low cost and good corrosion resistance.
Aluminum Magnesium Alloy Silo
Aluminum Magnesium Alloy Silo
Aluminum has excellent physical property and mechanical property, due to its low density, high strength, high thermal conductivity, high electrical conductivity, strong corrosion resistance, it will not produce electrical spark. Therefore, aluminum magnesium alloy silo is widely used to store PE, PP and other flammable and explosive materials in petrochemical equipment. Manxing has professional silo design and construction capabilities, and it strictly follows the national code for silo design and production, so Manxing silo is safe and reliable. Manxing aluminum magnesium alloy silo has the advantages of low cost, easy installation, low load and easy transportation.
Name:
*Email:
Tel/Whatsapp:
*Message:
Typical process layout
Stainless Steel Silo
Stainless Steel Silo
Ton Bag Unpacking Device
Ton Bag Unpacking Device
SILO TYPE SELECTION
Large Welded Steel Silo
Large Welded Steel Silo
Spiral Steel Silo
Spiral Steel Silo
Large Bolted Steel Silo
Large Bolted Steel Silo
Small Bolted Steel Silo
Small Bolted Steel Silo
WHY MANXING SILO
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +
Certifications
Engineering Experience and Clients
40+
Countries
100+
Technical patents
3000000T
Material storage capacity
900+
Silo projects
Client
Client
Client
Client
Client
Client
Client
Client
EPC SERVICE
Engineering Consultation
Engineering Consultation
Engineering Design
Engineering Design
Equipment Manufacturing
Equipment Manufacturing
Project Construction
Project Construction
Installation Debugging
Installation Debugging
Operation Management
Operation Management
Please feel free to give your inquiry in the form below.
We will reply you in 24 hours.
Name:
*Email:
Tel/Whatsapp:
*Message:
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000