Rapid & Quantitative Truck Loading System

Manxing rapid and quantitative intelligent truck loading system is based on the working principle of large hopper scale, and is a bulk material truck loading method that realizes the rapid and accurate measurement through the precise control of weighing silo batching gate.
Rapid & Quantitative Truck Loading System
Rapid & Quantitative Truck Loading System
Rapid & Quantitative Truck Loading System
Rapid & Quantitative Truck Loading System
Introduction
The Manxing rapid & quantitative truck loading system is designed based on the working principle of large hopper scale. It can carry out batching and accurate weighing in the weighing silo according to the load of truck in advance by the accurate control of weighing silo batching gate. Once the truck is in place, it can realize the quick and accurate measuring loading by controlling the discharge gate and loading chute, or through the precise control of material reserves in the weighing silo. It is one of the most advanced bulk material truck loading method. System Structure It is mainly composed of large steel structure tower, loading equipment, weighing system, hydraulic system, electronic control system, computer software system, etc.
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
Chat on WhatsApp
Contact Us
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000