Storage System Introduction
A bulk storage system is more than a silo — it is the chain of receiving, storing, reclaiming, conveying and controlling that decides whether your plant runs at full capacity. With 900+ silo projects delivered in 40+ countries, Manxing's engineering team sizes every system to your material's flow behavior, moisture and abrasiveness, then pairs the right silo construction with discharge and dust-control equipment so the line stays flowing with minimal manual intervention.
Bulk Material Storage System
From welded and spiral steel silos to enclosed stockyards and wharf handling, Manxing acts as a single EPC partner — one contract covering process design, in-house fabrication, civil works, installation and commissioning, so interfaces and responsibility stay clear.
Material Handling
Our handling scope wraps the silo end-to-end: receive, discharge, convey, blend, de-dust, weigh, bag and load — engineered as one coordinated train rather than isolated machines, which is what keeps material loss and downtime low.
Intelligent Control System
A Manxing plant is observable. PLC control with SCADA data acquisition puts live levels, alarms and trends on one screen, letting your operators manage storage and conveying remotely and catch deviations before they stop production.
INDUSTRY SOLUTION
-
Cement IndustryIn a cement line the silo is the buffer that lets the kiln and the packer run independently. Manxing designs raw-meal, clinker and cement silos with the right aeration and extraction so homogenization stays on spec and finished product flows straight to bulk truck or bag — no bottleneck at the dispatch point.
Continuous kiln-to-packer flowLong storage lifeIntegrated dust controlView More -
Thermal Power IndustryFly ash from coal combustion is light, abrasive and must never escape. Manxing builds sealed ash silos with positive-pressure conveying and dedusting at every transfer, so the material is handled automatically and the site stays inside emission limits.
Short construction periodStable & reliable operationHigh automationView More -
Bulk Material StockyardBefore material reaches the process it is often staged in a yard. Manxing's enclosed stockyard solutions — long-span space frames with reclaiming and dust-suppression — protect the material from weather and the neighborhood from dust, while lifting usable storage density.
Low cost per ton storedShort construction periodGood homogenization & expansionView More


