Feeding System
Material Handling System
Bulk Material Storage System Material Handling System Intelligent Control System
Feeding System
The lifting and feeding system is an indispensable part of the silo systems. Its main function is to vertically lift and transport the materials into the silo, and it is widely used in the lifting of bulk materials in factories, grain depots, port wharf and so on.
Air Chute
Air Chute
Air conveying chute is a kind of pneumatic conveying equipment for conveying dry powder materials.
Tgd-Type Wire Belt Bucket Elevator
Tgd-Type Wire Belt Bucket Elevator
TGD-type wire belt bucket elevator has the features of large conveying capacity, high lifting height, small size, low power consumption, stable and reliable operation and long service life. It is suitable for vertical lifting of dry bulk materials with temperature ≀130℃.
Plate Chain Bucket Elevator
Plate Chain Bucket Elevator
Plate chain bucket elevator takes steel chain as the traction member. Bucket adopts intensive and large-capacity arrangement, and it adopts inflow feeding and gravity-induced or centrifugal gravity-induced discharging methods. This kind of elevator runs smoothly and is suitable for lifting powdery, granular and nubby materials.
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000