Feeding System
The lifting and feeding system is an indispensable part of the silo systems. Its main function is to vertically lift and transport the materials into the silo, and it is widely used in the lifting of bulk materials in factories, grain depots, port wharf and so on.
-
-
Tgd-Type Wire Belt Bucket ElevatorTGD-type wire belt bucket elevator has the features of large conveying capacity, high lifting height, small size, low power consumption, stable and reliable operation and long service life. It is suitable for vertical lifting of dry bulk materials with temperature ≤130℃. -
Plate Chain Bucket ElevatorPlate chain bucket elevator takes steel chain as the traction member. Bucket adopts intensive and large-capacity arrangement, and it adopts inflow feeding and gravity-induced or centrifugal gravity-induced discharging methods. This kind of elevator runs smoothly and is suitable for lifting powdery, granular and nubby materials.
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in power plant boilers. It is a fine powder that is a byproduct of burning pulverized coal in electric generation power plants. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Bulk Material StockyardBulk material stockyard is the main form of bulk material storage, which can be divided into strip stockyard, spherical stockyard and high cylinder wall warehouse according to the different storage structures.
View More




