Large Bolted Steel Silo
A large bolted steel silo is a bulk material storage structure composed of steel plates assembled on site. All components are prefabricated in the factory and transported to the project site, where the entire structure is assembled through bolted connections.






























Introduction
A large bolted steel silo is a bulk material storage structure composed of steel plates assembled on site. All components are prefabricated in the factory and transported to the project site, where the entire structure is assembled through bolted connections. The silo typically features either a conical or flat bottom, with a closed top. It is suitable for storing and handling various powdered or granular materials, especially cement.
Advantages
-
01Modular design, easy installation
-
02High strength and structural stability
-
03Flexible dismantling and reusability
-
04Easy expansion and upgrading
-
Safe Structural Design -
3D Display -
Smooth Discharge System -
Precision Manufacturing -
Outstanding Performance -
Intelligent Control
SILO TYPE SELECTION
INDUSTRY SOLUTION
-
Cement IndustryIn each section of cement plant, storage and transportation system plays a decisive role. For example, raw material homogenization and transportation, clinker storage and transportation, as well as finished cement storage, conveying and distribution. Manxing provides bulk material storage and transportation system solutions for cement plant customers.
View More -
Thermal Power IndustryFly ash is produced with the combustion of pulverized coal in thermal power plant, which will pollute the environment if it is not treated properly. Recovery and utilization of fly ash can avoid environmental pollution and increase economic benefits. Manxing provides customers with fly ash storage, transportation and separation systems, and professional solutions.
View More -
Coal MineIn the process of coal production, the traditional open-air storage of coal, loading of artificial loader are gradually phased out due to serious pollution and low efficiency. Manxing provides customers with large coal storage silo, rapid loading system, rapid and quantitative loading system, long distance belt conveyor, and other solutions.
View More
Reference
We have built projects in more than 30 countries and regions, with more than 900 sets of steel silos and up to 3 million tons of materials storage capacities.
-
6x10,000T Welded Clinker Silo System for San Miguel CorporationThis project is San Miguel Corporation, Davao, the Philippines 10x10000 tons steel silos system contracted by Manxing. Among which, there are six clinker steel silos.Clinker60,000 tonsLarge welded steel silo -
Hubei-JUHAI Environment Ceramsite and Phosphogypsum Storage Packaging ProjectThis project is the Phase II of the silo project of phosphogypsum solid waste industry of Hubei JUHAI Environment, which is the first ceramsite and phosphogypsum storage and packaging engineering project constructed by our company.Phosphogypsum6Small welded steel silo -
Indonesia 6,000T Cement Steel Silo Project for SIGThis is a cement transfer project, of which the owner is SIG, the largest cement producer in Indonesia.Cement6000 tonsSpiral silo
WHY MANXING SILO
Our vision is to be international respected brand in the field of bulk materials storage and transportation field; Technology builds the beauty of project is our product and service principles; High-standard, globalized and to be an internationalized brand are our business philosophy.
-
ABOUT ManxingHENAN Manxing Silo Engineering Co., Ltd. is China leading reputable EPC Contractor for bulk materials storage silo project, closed storage yard, and bulk material port handling project for cement, clinker, fly ash, coal, slag powder, sand and gravel aggregate, grain, etc.
-
Manxing TECHNOLOGYManxing focuses on scientific and technological research, currently we have 100+ patented technologies, among which 10 are invention patents. Manxing has a team of experienced technical engineers which can design the silo solution according to the project details.
-
Manxing PROJECT EXPERIENCEWe have built projects in more than 40 countries and regions, with more than 900 sets of steel silos and over 3 million tons of materials storage capacities, Manxing quality and reputation are highly recognized by global users.
-
Manxing MISSIONTo serve global customers in the field of bulk materials storage and transportation, with safe, reliable and professional EPC solution that represents China's top level capacity on engineering design, equipment manufacturing and project management standards.
ISO, SGS, RHEINLAND CERTIFICATION; 100+ Technical patents including invention patents.
More Related Certificates +

Engineering Experience and Clients
-
40+Countries
-
100+Technical patents
-
3000000TMaterial storage capacity
-
900+Silo projects
Request a Quote
Get Your Custom Solution
Interested in this solution? Get a free consultation and project assessment. Our engineers will respond within 24 hours.
































