Silo System
Bulk Material Storage System
Bulk Material Storage System Material Handling System Intelligent Control System
Silo System
Silos can be used to store all kinds of bulk materials. They are often used in cement plants, thermal power plants, grinding stations, transfer terminals and other industries because of their durability, low cost, high degree of automation and wide application range.
Plastic Particle Steel Silo
Plastic Particle Steel Silo
Plastic Particle Steel Silo is primarily utilized for storing plastic particles such as polypropylene, polyethylene, polystyrene, polyvinyl chloride, ABS, and nylon.
Silo Type:Bolted steel silo
Application:Construction materials, chemical industry, machinery industry, etc.
Hydrated Lime Silo System Solution
Hydrated Lime Silo System Solution
Lime silo system is a common method for the lime storage and transportation industry. Manxing has two common silos types: Welded Steel Silo and Spiral Silo to store hydrated lime. Hydrated lime silo system includes steel silos and supporting auxiliary equipment, built for the storage and transportation of hydrated lime, and is widely used in building industry, petroleum industry, etc
Silo Type: Welded Steel Silo, Spiral Sealing Steel Silo
Application:Building Materials, Petroleum Industry, Raw Materials for Industry, etc.
Storage Capacity:200 - 30000 Tons
Storage Material: Lime, Hydrated Lime, etc.
Pulverized Coal Steel Silo
Pulverized Coal Steel Silo
Compared with raw coal, pulverized coal has a smaller particle size, a larger surface area, and a certain level of explosiveness.
Silo Type:Welded steel silo
Application:Power plants
Alumina Steel Silo
Alumina Steel Silo
Alumina powder is produced through the Bayer process and is primarily used in the production of electrolytic aluminum, ceramics, and refractory materials. It is a white powder with good fluidity and low density.
Silo Type:Spiral steel silo
Application:Ceramics, medicine, electronics, machinery and other industries
Cement Silo
Cement Silo
Cement production enterprises need store cement to balance the supply and demand of cement in low and peak seasons for cement production.
Silo Type:Welded steel silo,Spiral steel silo
Application:Cement plants, cement transfer centers, concrete mixing plants, etc.
Ore Powder Steel Silo
Ore Powder Steel Silo
The ore powder silo is primarily utilized for storing phosphate rock powder, kaolin, feldspar powder, slag powder, limestone powder, iron concentrate, and other materials.
Silo Type:Spiral steel silo,Bolted Steel Silo
Application:Construction materials, metallurgy, chemical and construction industries
Fly Ash Silo
Fly Ash Silo
Fly ash can be used in the production of building materials, and its recycling can reduce pollution and increase economic benefits. Therefore, the storage of fly ash is crucial.
Silo Type:Welded steel silo
Application:Power station, fly ash transit center, concrete batching plant
Petroleum Coke Silo System
Petroleum Coke Silo System
Petroleum coke steel silos are manufactured using advanced technology based on the characteristics of petroleum coke, perfectly solving the core issues of moisture, dust and fire prevention during the storage of petroleum coke. Our petroleum coke steel silos are widely used in petrochemical, electric power, metallurgy, carbon and other industries, providing customers with safe, economical and efficient storage solutions.
Clinker Silo
Clinker Silo
Clinker silo is one of the important structures in cement plants. Due to the different plant sizes, single silo storage capacity ranges from 2000t to 50,000t
Silo Type:Spiral steel silo,Welded steel silo
Application:Cement mill plant, clinker transit center
Tel: +86 159 3903 7000
[email protected]
+86 159 3903 7000